Colt developed the design basis memorandum (FEL 2) and basic engineering package (FEL 3). The scope of the project included a new S-Zorb unit, SO2 recovery process (CANSOLV) modifications to two FCCU gas plants, distillate desulphurizing unit, sulphur plant and various utilities. For the first FCCU, Colt developed the design for 30 PPM. For the second FCCU, Colt developed a HYSYS simulation for the fractionator and gas plant. This included reconciling the simulation against test-run data and benchmarking to establish a base case.This project was an extensive revamp involving the replacement of much of the existing equipment. The project impacted the plant’s FCCU, the gas plant, crude unit and distillate desulphurization unit. An innovative approach was used to minimize turnaround hours and their effect on operations
Archives
-
▼
2009
(20)
-
▼
October
(20)
- Thwarted Terrorist Plot Highlights Importance of S...
- UK trade gap widens as oil swings to deficit
- Oil Trade in Indonesia
- Oil Rig in Nigeria
- trade oil
- BRI PROCESS SCHEMATIC
- Bizarro World: Petroleum Sovereignty Edition
- Exploration& Production of Coal
- Exploration& Production of Coal
- Exploration& Production of Coal
- Exploration& Production of Coal
- Oil and Gas Trade
- REBCO OIL
- CARACAS
- TALADROS CHINO EN GUNTA
- Solvents cover a huge number of substances: gas li...
- Every time an election is held for any office, the...
- Twin Valley Co-op Ltd. supplies bulk fuel from our...
- Colt developed the design basis memorandum (FEL 2)...
- The word Petroleum is derived from two words Petra...
-
▼
October
(20)
Thursday, October 29, 2009
Posted by waseem at 12:25 AM
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment